sticky logo DM BAU

FC Aarau smzh Adlerstube

Project details

Client: JALE Invest AG / FC Aarau

Construction systems: Modular timber construction

Construction period: 8 weeks

Year of construction: 2025

Architect: K+P Architektur AG

Area (m²): 84

Location: Suhr

Feature: Execution as total contractor

The new "smzh Adlerstube" building at FC Aarau's Brügglifeld stadium provides a new event center. The aging, temporary container solution has been replaced by a modern hybrid modular construction. The modern modular architecture combines clear functionality with a high quality of stay. A versatile area has been created in a limited space, intelligently connecting indoor and outdoor areas. The compact design allows for flexible use and impresses with its open, inviting atmosphere. A split unit in the outdoor area heats the rooms in winter and cools them in summer.

Despite challenging conditions, the project was completed precisely and efficiently within a short construction period. The limited space available at the legendary Brügglifeld stadium required careful planning, and installation was carried out with consideration for ongoing match operations. However, thanks to modular construction technology, the construction period and noise emissions were kept to a minimum.

 

Space for encounters and perspectives

The smzh Adlerstube offers companies an exclusive setting for events and guest receptions on match days. An event room with a built-in kitchen forms the center of the facility, complemented by two separate rooms on the first floor. The security room on the upper floor allows the police to monitor the guest sector during high-risk games. The VIP lounge, also on the upper floor, offers privacy and comfort while FC Aarau fights for further victories. Two roof terraces offer exciting views of the pitch and are a special experience. A men's and women's toilet accessible from the outside complete the new Adlerstube.

The lounge is designed for up to 32 people and combines comfort with functional flexibility.

 

 

"Weare delighted with the new lounge, and our guests have also responded very positively."

Jérôme Thiesson, Head of Operations, FC Aarau

Highlights

  1. Exclusive lounge
  2. Two rooftop terraces with a view of the playing field
  3. Integrated kitchen
  4. Efficient modular design
  5. Short construction period of only 8 weeks
Are you interested in a project or would you like a no-obligation consultation? We look forward to hearing from you.