Detached house in Altstätten

Project details

Client: Ruedi Städler

Industry: Housing

Construction systems: Timber element construction

Construction time: 7 months

Year of construction: 2011

Architect: DMBAU

Area (m²): 215

Place: Altstätten

Execution as general contractor

An old vacation home was renovated. After demolition down to the basement ceiling, a two-storey timber element construction was built as an extension. All current standards (Minergie) and high finishing requirements were more than fulfilled. A timber façade was chosen for the external cladding. Rhomboid cladding was used, which was supplemented and broken up with natural slate panels. The construction deadline of seven months was met to the complete satisfaction of the client.

Highlights

  • Sustainable and ecological construction
  • High quality
  • Expansion to Minergie standard