Bethesda Hospital New building and extension of maternity clinic

Project details

Client: Diakonie Bethesda Foundation

Industry: Healthcare

Construction systems: Solid modular construction

Construction time: 4 and 6 months

Year of construction: 2019 and 2017

Architect: C2M Architekten GmbH and Diakonat Bethesda Foundation

Area (m²): 95 and 290

Place: Basel

Execution as general contractor

The permanent extension to the gynecology department of Bethesda Hospital in Basel includes consultation and examination rooms, waiting and reception rooms. The hospital building is constructed using our solid module technology, which meets the highest energy requirements (Minergie) as well as all the specific requirements of a hospital building. The concrete floor of our solid modules ensures stability, a good sense of space and complements the solid, high-quality building fabric. The building is structurally designed for a possible future extension. The hospital construction project was successfully implemented in a very short time. Just six months after the contract was signed, the hospital building was handed over to the client and put into operation at the end of July 2017.

Highlights

  • Minimal emissions on the construction site thanks to high prefabrication rate
  • Realization during ongoing hospital operations
  • Expansion and extension options
  • Extension/addition to existing building
  • 2 antenatal rooms
  • No thresholds/wheelchair-accessible throughout
  • Medical building incl. medical equipment (medical gas, oxygen, etc.)
  • High-quality plaster base façade cladding