Mels school building

Project details

Client: Municipality of Mels

Sector: Education

Construction systems: Modular timber construction

Construction time: 10 weeks

Year of construction: 2025

Architect: Guetg Lorenzo, Basel

Area (m²): 1080

Place: Mels

Characteristic: Execution as general contractor

With the new school building in Mels, the municipality has opted for a pioneering, modular timber construction method. The resource-saving construction impresses with its short construction time, high energy efficiency and flexible usage options. Thanks to prefabricated timber modules, the building can be easily extended as required, making a sustainable contribution to the educational infrastructure.

The approximately 1081 m2 school building has a cold roof with robust sheet metal covering and barrier-free access with a ramp and canopy. The connection to the existing district heating system ensures an efficient energy supply.

Automated systems for shading, heating and lighting reduce maintenance costs. The CO2-neutral timber construction creates a healthy indoor climate and a modern, functional learning environment.

Highlights

  1. Flexible wardrobe solutions with customizable system
  2. CO2-neutral construction through the use of wood
  3. Reduced maintenance costs thanks to intelligent building technology
  4. Modern school building that combines technology, sustainability and functionality and blends harmoniously into the village landscape