Lachen Hospital bed wing

Project details

Client: Spital Lachen AGSwiss health care companyTicino

Industry: Healthcare

Construction systems: Solid modular construction

Construction time: 5 months, extension 3 months

Year of construction: 2012, extension 2017

Architect: Rütti & Partner Architects

Area (m²): 1950

Place: Lachen

Execution as a total contractor

Lachen Hospital is a regionally based healthcare center with a comprehensive range of services. Over the next few years, the existing buildings of the hospital, which is over 100 years old, will be completely renovated. Back in 2012, the decision was made to add a solid module construction to the existing building. We constructed the building as a total contractor with 76 solid modules.

This bed wing was extended in 2017. Within three months, we completed the twelve new comfortable double and single rooms and a patient lounge. Normal hospital operations had to be fully maintained during this challenging construction project. Operations and construction activities therefore had to be perfectly coordinated.

Highlights

  • Regular hospital operations were not interrupted during the entire construction period
  • Private ward with all amenities
  • Minimal emissions thanks to prefabrication
  • Sustainability through dismantling option