Temporary bed facility Valens

Project details

Client: Valens Clinics

Industry: Healthcare

Construction systems: Solid modular construction

Construction time: 3 months

Year of construction: 2023

Architect: Mayer Architektur AG

Area (m²): 1'414

Place: 7317 Valens

Characteristic: Execution as general contractor

As part of the renovation plans for the Valens rehabilitation center, a temporary bed was successfully implemented. This was erected on site with minimal restrictions within a construction period of just 3 months. The implementation of 22 fully equipped prefabricated wet cells was carried out thanks to the high degree of prefabrication at our plant in Oberriet, which enabled efficient assembly. Despite the logistical challenges posed by the geographical location and the transport route, we worked closely with our long-standing transport partner to ensure that the generously dimensioned modules were transported safely and on time without causing any significant inconvenience to the villagers. The modern temporary bed facility is equipped with numerous ward rooms, including 12 single rooms and 10 triple rooms. The connection to the existing building is ensured by two passages in both wings. It offers ideal conditions for the unrestricted care and treatment of patients, despite the extensive renovation of the main building.

Highlights

  1. 1'414 m2
  2. 12 single rooms and 10 triple rooms
  3. 22 prefabricated wet cells
  4. Geographical location and transport route