Corjon Nyon extension

Project details

Client: ASHOL Association de Soutien

Industry: Healthcare

Construction systems: Timber element construction

Construction time: 4 months

Year of construction: 2015

Architect: Kunik de Morsier Architectes

Area (m²): 468

Place: Nyon

Execution as general contractor

The project combined a wide range of challenges: No disruption to ongoing hospital operations, difficult access to the roof, occupational safety and, above all, avoiding damage caused by roof water ingress during the construction work. We were able to overcome these challenges thanks to the very short shell construction time of just 3 days. The roof and wall elements were prefabricated ready for assembly at our factory in Oberriet SG and only had to be joined together to form the building on the construction site.

Highlights

  • Move into the building just 15 weeks after signing the contract
  • Polycarbonate façade
  • Cooperation with local subcontractors