sticky logo DM BAU

Daycare center UAPE Gland

Project details

Client: Municipality of Gland

Industry: Public

Construction systems: Solid modular construction

Construction time: 6 months

Year of construction: 2012

Architect: Kunik de Morsier architectes SIA

Area (m²): 1184

Place: 1196 Gland

Execution as general contractor

The population of the municipality of Gland (VD) has risen steadily in recent years. The increase in population also means a greater need for daycare facilities for the municipality. With the solid module construction technique, we were able to offer a solution that required an astonishingly short construction time but still guaranteed a high level of sustainability. The solid modules were placed within seven days. This reduced the disruptive construction noise to an absolute minimum. The two-storey building can be extended by a further storey at any time without great effort.

Highlights

  1. Canteen with kitchen
  2. Extension possible
  3. Rockpanel facade
  4. Friendly color scheme
  5. High-quality building materials
Are you interested in a project or would you like a no-obligation consultation? We look forward to hearing from you.