Luftmatt temporary school building

Project details

Client: Building and Transport Department of the Canton of Basel-Stadt

Sector: Education

Construction systems: Solid modular construction

Construction time: 7 weeks

Year of construction: 2022

Architect: Architectural office Guetg Lorenzo

Area (m²): 670

Place: Basel

Execution as general contractor

The temporary school building was erected on site during the 2022 summer vacations within a construction period of just 7 weeks and was put into operation on time for the start of the 2022/2023 school year. The modern building offers eight bright classrooms, six closed WC rooms as well as an IV WC, two technical rooms and a cleaning room. Decentralized ventilation provides the necessary air regulation for the sanitary facilities. An air/water heat pump is used as the heating system, which is located on the roof alongside a large PV system. The building has two entrances and barrier-free access via a ramp. The building can be expanded or extended at short notice. It adapts flexibly to changing requirements.

Highlights

  1. Solid modular construction (timber element walls, concrete floor in steel construction)
  2. Fast availability thanks to know-how and reuse of existing modules
  3. Eight 60m2 classrooms spread over two floors with a room height of 2.80 m
  4. Extended presence detection for energy-efficient building operation
  5. Fatigue-free and expandable steel staircase
  6. High level of prefabrication, building services pre-installed
  7. Curtain-type, maintenance-free building façade
  8. Turnkey construction according to customer requirements
  9. Intended service life 15 years and a service life of many more years.