sticky logo DM BAU

International School of Berne, Gümligen

Project details

Client: ISB International School of Berne

Sector: Education

Construction systems: Solid modular construction

Construction time: 2.5 months

Year of construction: 2007

Architect: Mr. Sven Stucki Dipl. Architect ETH SIA

Area (m²): 550

Place: Gümligen

Execution as general contractor

The solid module construction was realized on the existing parking lot. During the construction process, it was a great advantage that the most important building elements could be erected within just two days. This meant that school operations were practically undisturbed. The interior work took just four and a half weeks. Not only were the fire safety requirements met, but open, aesthetically pleasing rooms were also created, confirms architect Sven Stucki. "A high standard of fit-out was achieved for a temporary building," summarizes the architect.

Highlights

  • Floor heating
  • Sustainability through dismantling option
Are you interested in a project or would you like a no-obligation consultation? We look forward to hearing from you.